Developer-Installed
The San Bernardino Municipal Water Department (SBMWD) requires Developer-Installed Agreements for extensions of water backbone infrastructure to developments or lands. The applicant must complete Exhibit "A" (Application for Developer-Installed Agreement/Water Plan Review Technical Information) of Rule and Regulation 20.
- Application Rule and Regulation No. 20 Package (PDF)
- Process Description Flowchart - in progress
Developer Installed Check List by Phase
The Developer-Installed Checklist is comprised of five phases. Submittals for each phase must be received by SBMWD as one complete package.
- Phase 1 - Cost Letter (PDF)
- Phase 2 - Plan Check (PDF)
- Phase 3 - Agreement (PDF)
- Phase 4 - Pre-Construction (PDF)
- Phase 5 - Conveyance (PDF)
Developer Kickoff Information
The following files contain SBMWD Standard Specifications, Standard Drawings, and Submittal Requirements for Developer Installed Agreement.
- Appendix E - SBMWD Standard Specifications and Standard Drawings
- Appendix E - AutoCAD Standards
- Section 2 - System Analysis (PDF)
- Section 4 - Submittals and AutoCAD Standards (PDF)
- Section 5 - Design Standards
Developer-Installed Conveyance Submittal Package
- Cover Sheet (PDF)
- Table of Contents (PDF)
- Financial Releases (PDF)
- Section 1.0 - Submittal Requirements and Autocad Standards (PDF)
- Section 2.0 - Autocad Standards (PDF)
- Section 3.0 - Contractors Redlines (PDF)
- Section 4.0 - Final As-Built Plans (PDF)
- Section 5 - Material Cost Breakdown Example (PDF)
- Section 6.0 - Trench Compaction Report (PDF)
- Section 7.0 - Fire Hydrant Flow Test (PDF)
- Section 8.0 - Notice of Completion and Financial Releases (PDF)
- Section 9.0 - Warranty Bond (PDF)